By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
GCC RailwayGCC Railway
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
Reading: UAE seeks civils contractors for Dubai to Abu Dhabi high-speed rail line
Share
Notification
GCC RailwayGCC Railway
Search
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
© 2024 All Rights reserved | Powered by GCC Railway
GCC Railway > UAE > UAE seeks civils contractors for Dubai to Abu Dhabi high-speed rail line
UAE

UAE seeks civils contractors for Dubai to Abu Dhabi high-speed rail line

February 3, 2025 4 Min Read
Share
UAE seeks civils contractors for Dubai to Abu Dhabi high-speed rail line
SHARE

Growth of a brand new 150km high-speed rail line between Abu Dhabi and Dubai within the United Arab Emirates (UAE) is transferring ahead with the discharge of tender paperwork for design and construct civils contracts.

NCE sister title Floor Engineering reported that the railway line will allow people to journey between Abu Dhabi and Dubai in half-hour, reaching speeds of as much as 350km/h.

The road is anticipated to be operational by 2030 and contribute AED145bn (£32bn) to the UAE’s GDP over the following 5 many years. It the primary section of a bigger railway community.

UAE’s Etihad Rail unveiled the plans on 23 January. It’ll oversee the event and operation of the undertaking.

As reported by Center East information organisation MEED, the railway firm is now inviting tenders for a contract to design and construct the civil works and station packages for the railway line.

The tender discover was issued on 10 January with a bid submission deadline of seven Could.

The railway line will stretch from the Al-Zahiyah space of Abu Dhabi to Al-Jaddaf in Dubai and embody 5 stations. A complete of 31km of the route shall be tunnelled.

The undertaking’s civil works have been break up into two packages comprising 4 sections. The scope of those sections consists of:

Part 1A: Al-Zahiyah to Yas Island (23.5km)
Part 1B: Yas Island to the border of Abu Dhabi/Dubai (64.2km)
Part 1C: Abu Dhabi/Dubai border to Al-Jaddaf (52.1km)
Part 1D: Abu Dhabi airport delta junction and reference to Abu Dhabi airport station (9.2km).

The rail line can have stations at Al-Zahiyah (ADT), Saadiyat Island (ADS), Yas Island (YAS), Abu Dhabi airport (AUH) and Al-Jaddaf (DJD).

See also  Qatar Participates in Global Rail Exhibition and Conference in Abu Dhabi

The ADT, AUH and DJD stations shall be underground.

MEED has additionally reported that preliminary web site testing works have already begun.

It named the businesses concerned on this programme as Dubai-based Matcon Testing Laboratory and Abu Dhabi’s Engineering & Analysis Worldwide.

They’re conducting drilling assessments to determine the bottom situations in areas by means of which the high-speed railway line will move.

Spanish engineering companies Sener and Ineco have been appointed because the undertaking’s engineering consultants.

Dubai Metro

One other main transport infrastructure undertaking presently underway within the UAE is the Dubai Metro Blue Line undertaking.

The brand new metro line will run underground for 15.5km and above floor for 14.5km. It’ll join Dubai Worldwide Airport and 9 key areas alongside the road.

The undertaking was given the go-ahead by vice chairman and prime minister of UAE and ruler of Dubai Sheikh Mohammed bin Rashid Al Maktoum in November 2024.

Dubai’s Roads & Transport Authority final month introduced that it had awarded the contract for the Dubai Metro Blue Line undertaking to a consortium of three main Turkish and Chinese language firms: civil works contractors Mapa and Limak with railway programs provider CRRC.

Building on the Metro Blue Line is because of start in April 2025, with the road set to open in September 2029.

Like what you have learn? To obtain New Civil Engineer’s every day and weekly newsletters click on right here.

You Might Also Like

Renfe’s recruitment drive attracts 38,000 women in Saudi Arabia for train driver training

Saudi Arabia Railways Joins EULYNX Signalling Consortium

Pakistan, UAE to expand cooperation in railways, economic sectors

Lusail Tram Turquoise Line opens

Saudi Arabia unveils ‘Dream of the Desert’, Middle East’s first five-sta

TAGGED:Railways NewsUAE
Share This Article
Facebook Twitter Copy Link

Latest News

Etihad Rail Introduces Certificates for Carbon Emission Reduction
Etihad Rail Introduces Certificates for Carbon Emission Reduction
UAE June 19, 2025
Tunnel along the new Doha Metro Red Line
Doha Metro Red Line Starts Preview Services
Qatar June 18, 2025
Everything You Need To Know About The UAE-Oman 238km, Multi-Billion-Dollar Railway Project
Everything You Need To Know About The UAE-Oman 238km, Multi-Billion-Dollar Railway Project
UAE June 17, 2025
BAHRAIN CONFIRMS THE FIRST PHASE OF THE AMBITIOUS METRO RAIL PROJECT
Bahrain To Complete 109-km Light Metro Rail Bids On Mar 20
Bahrain June 15, 2025
How to Train Your Dragon actor, Gerard Butler on how Saudi Arabia is opening up to the world | World News
How to Train Your Dragon actor, Gerard Butler on how Saudi Arabia is opening up to the world | World News
Saudi Arabia June 14, 2025
Qatar Rail wins CIHT 2025 Decarbonisation Award for ‘Regenerative Propulsion in the Doha Metro’
Qatar Rail wins CIHT 2025 Decarbonisation Award for ‘Regenerative Propulsion in the Doha Metro’
Qatar June 14, 2025

You Might also Like

Saudi Arabian trains to blend modern aesthetics and advanced technology | News
Saudi Arabia

Saudi Arabian trains to blend modern aesthetics and advanced technology | News

January 9, 2025
Saudi Arabia's First Luxury Train Unveiled
Saudi Arabia

Saudi Arabia’s First Luxury Train Unveiled

January 31, 2025
Preparatory work begins for railway link between Oman and UAE
Oman

Preparatory work begins for railway link between Oman and UAE

August 30, 2024
UAE: New Etihad Rail passenger train station in Fujairah revealed - News
UAE

UAE: New Etihad Rail passenger train station in Fujairah revealed – News

October 8, 2024
gccrailway gccrailway
gccrailway gccrailway
Our platform is dedicated to delivering insightful coverage and analysis of the railway sector in Saudi Arabia, the UAE, Qatar, Kuwait, Oman, and Bahrain..

Editor Choice

Oman News Agency
Unveiling Saudi’s first five-star luxury train
Alstom and Saudi Railway Company forge SAR 300 million partnership to boost rail network

Follow Us on Socials

We use social media to react to breaking news, update supporters and share information

Facebook Twitter Telegram
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Service
Reading: UAE seeks civils contractors for Dubai to Abu Dhabi high-speed rail line
Share
© 2024 All Rights reserved | Powered by GCC Railway
Welcome Back!

Sign in to your account

Lost your password?