By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
GCC RailwayGCC Railway
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
Reading: Etihad Rail begins UAE high-speed rail prequalification
Share
Notification
GCC RailwayGCC Railway
Search
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
© 2024 All Rights reserved | Powered by GCC Railway
GCC Railway > UAE > Etihad Rail begins UAE high-speed rail prequalification
UAE

Etihad Rail begins UAE high-speed rail prequalification

September 9, 2024 4 Min Read
Share
SHARE

The prequalification course of is underneath means for upcoming design-and-build works packages for the rail hyperlink connecting Abu Dhabi and Dubai.

The UAE’s Etihad Rail has requested contractors to submit prequalification types by 11 September for a contract to design and construct the civil works packages for the road connecting Abu Dhabi and Dubai.

The prequalification discover was issued in July. The earlier deadline was 14 August.

READ MORE: UAE high-speed rail development plans revealedREAD MORE: Contractors type joint ventures for UAE high-speed rail READ MORE: The UAE’s first passenger railway stations revealedREAD MORE: Etihad Rail indicators $2.3bn Jordan phosphate rail settlement

Contractors are additionally forming joint ventures to bid for upcoming design-and-build works packages for the high-speed rail line undertaking.

MEED completely reported on the development plans for the UAE’s high-speed railway (HSR) community in early September. The design pace of the trains operating on the community will probably be 350 kilometres an hour (km/h) and the working pace will probably be 320km/h.

The proposed HSR programme will probably be constructed in 4 phases, steadily including extra connectivity to different areas throughout the UAE.

The primary section entails the development of a railway line connecting Abu Dhabi and Dubai, which is estimated to be operational by 2030.

The second section will contain the event of an inner-city railway community with 10 stations inside Abu Dhabi metropolis.

The third section of the railway community entails the development of a connection between Abu Dhabi and Al-Ain.

The fourth section entails the event of an inter-emirate connection between Dubai and Sharjah.

The 150-kilometre (km) first section of the HSR will stretch from the Al-Zahiyah space in Abu Dhabi to Al-Jaddaf in Dubai.

See also  UAE and GCC Tourists Can Now Enjoy Effortless Exploration of Japan with the Pre-Purchase Japan Rail Pass – Discover How It Transforms Your Travel Experience!

The undertaking’s civil works have been cut up into two packages (Abu Dhabi and Dubai), comprising 4 sections (1A/1B/1C/1D). The Abu Dhabi bundle contains sections 1A, 1B and 1D. The Dubai bundle contains part 1C.

The scope of those sections contains:

Section 1A: Al-Zahiyah to Yas Island (23.5km) Section 1B: Yas Island to the border of Abu Dhabi/Dubai (64.2km)Section 1C: Abu Dhabi/Dubai border to Al-Jaddaf (52.1km)Section 1D: Abu Dhabi airport delta junction and reference to Abu Dhabi airport station (9.2km)

The undertaking will embrace vital tunnelling works totalling 31km.

The rail line may have 5 stations. These will probably be in Al-Zahiyah (ADT), Saadiyat Island (ADS), Yas Island (YAS), Abu Dhabi airport (AUH) and the Al-Jaddaf (DJD) space in Dubai.

The ADT, AUH and DJD stations will probably be underneath floor, whereas ADS will probably be an elevated station and YAS will probably be at grade.

The general development bundle additionally contains provisions for the rolling inventory, railway programs and two upkeep depots.

The high-speed undertaking will slash journey occasions between the UAE’s two largest cities and financial centres. The journey time between the YAS and DJD stations will probably be half-hour.

The preliminary website testing works have begun. Dubai-based Matcon Testing Laboratory and Abu Dhabi’s Engineering & Analysis Worldwide are conducting drilling exams to establish the bottom situations in areas via which the HSR will go.

Spanish engineering corporations Sener and Ineco are the undertaking’s engineering consultants.

You Might Also Like

UAE participates in GCC Railway Authority Council meeting in Riyadh

Saudi Arabia Railways carries record 14 million passengers in 2025

UAE’s Etihad Rail: A Game-Changer for Passenger Travel in 2026 Connecting Abu Dhabi, Dubai, Sharjah, Fujairah, and More – Here’s What You Need to Know About Routes, Stations, and Travel Times

UAE Unveils Ambitious High-Speed Rail Project

Saudi Arabia and Egypt Confirm High-Speed Rail Link

TAGGED:Railways NewsUAE
Share This Article
Facebook Twitter Copy Link

Latest News

UAE and Bahrain to trial scheme to ease travel for citizens across the Gulf
UAE and Bahrain to trial scheme to ease travel for citizens across the Gulf
Bahrain February 22, 2026
Etihad Rail operator gets new CEO ahead of passenger service launch
UAE February 21, 2026
parallax background
New train service to link Dubai and Abu Dhabi in under one hour
UAE February 21, 2026
Dubai Metro: UAE’s Etihad Rail operator Keolis appoints Yoen Dupuis as CEO ahead of passenger service launch | World News
UAE February 20, 2026
UAE Signs First Contract for $8B High-Speed Rail Project
UAE Signs First Contract for $8B High-Speed Rail Project
UAE February 20, 2026
A Record Year for Transit: Saudi Arabia Railways is Propelled into the Future by Milestone Ridership and Technological Expansion
A Record Year for Transit: Saudi Arabia Railways is Propelled into the Future by Milestone Ridership and Technological Expansion
Saudi Arabia February 19, 2026

You Might also Like

Bahrain holds investor event for metro project
Bahrain

Bahrain holds investor event for metro project

January 14, 2025
Riyadh Unites Doha, Abu Dhabi, Dubai, and Dammam and Bahrain – How GCC is Transforming Travel with New High-Speed Railway Network in 2026!
Bahrain

Riyadh Unites Doha, Abu Dhabi, Dubai, and Dammam and Bahrain – How GCC is Transforming Travel with New High-Speed Railway Network in 2026!

January 3, 2026
Photo of Sakina Fatima
UAE

Sheikh Mohammed boards Etihad Rail from Dubai to Fujairah

August 3, 2025
UAE minister experiences Etihad Rail's passenger service ...
UAE

UAE minister experiences Etihad Rail’s passenger service …

October 8, 2025
gccrailway gccrailway
gccrailway gccrailway
Our platform is dedicated to delivering insightful coverage and analysis of the railway sector in Saudi Arabia, the UAE, Qatar, Kuwait, Oman, and Bahrain..

Editor Choice

Follow Us on Socials

We use social media to react to breaking news, update supporters and share information

Facebook Twitter Telegram
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Service
Reading: Etihad Rail begins UAE high-speed rail prequalification
Share
© 2024 All Rights reserved | Powered by GCC Railway
Welcome Back!

Sign in to your account

Lost your password?