By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
GCC RailwayGCC Railway
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
Reading: Bahrain to Build First Railways by 2030
Share
Notification
GCC RailwayGCC Railway
Search
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
© 2024 All Rights reserved | Powered by GCC Railway
GCC Railway > Bahrain > Bahrain to Build First Railways by 2030
Bahrain

Bahrain to Build First Railways by 2030

August 31, 2024 2 Min Read
Share
Bahrain to Build First Railways by 2030
SHARE

Kamal Ahmed, Bahrain’s minister of transport confirmed this week {that a} rail masterplan which incorporates mainline connections to neighbouring international locations Saudi Arabia and Qatar together with plans for metro, gentle rail and monorail methods will likely be accomplished by the tip of the 12 months. These could be the primary railways inbuilt Bahrain and could be accomplished by 2030.

2022 Qatar Fifa World Cup

Anticipating to value $4.5 billion (US) and stretching 90km, the double-track railway linking Saudi Arabia and Bahrain together with a 40km causeway between Bahrain and Qatar are hoped to be accomplished and working in time for the 2022 Fifa World Cup which will likely be hosted by Qatar. Discussions between the international locations are nonetheless underway and a extra particular timeline for the implementation of the plan ought to be accomplished by the center of of subsequent 12 months.

Ahmed stated “We’re reviewing the alignment of the practice community, as a result of the concept is to hyperlink Saudi Arabia and Bahrain, and we additionally wish to hyperlink it to the port and the airport. We have to determine the precise alignments – essentially the most possible and cost-effective method. We are going to finalise this by the tip of the 12 months, after which we are going to work with our brothers in Saudi Arabia to see what’s the finest procurement methodology to finance this undertaking. Possibly by the primary or second quarter of subsequent 12 months, we’ll have a extra stable plan a couple of timeline for implementation.”

See also  Bangladesh train services resume after strike called off

Ahmed went on to say “Conferences are being carried out as typical; there are such a lot of committees, monetary and technical, and it’s not a straightforward undertaking. Plans maintain altering, and designs, clearly, however it’s happening. It needs to be accomplished earlier than the World Cup.”

You Might Also Like

Why IMEEC Can’t Take Off Without New Tracks in the Middle East

Kenya turns to UAE for railway funding after China’s withdrawal

How New Gulf Rail Links, Kuwait’s Eight Million USD Deal, and Saudi Arabia Luxury Train Will Transform Middle East Tourism

Kuwait Kicks Off First Phase of Landmark Railway Project

India expands railway equipment exports to Europe, Australia, and Saudi Arabia

TAGGED:BahrainRailways News
Share This Article
Facebook Twitter Copy Link

Latest News

Hafeet Rail receives first railway tracks shipment for Oman–UAE network at Sohar Port
Hafeet Rail receives first railway tracks shipment for Oman–UAE network at Sohar Port
Oman September 16, 2025
Rolls-Royce to power Saudi Arabia’s new high-speed trains
Rolls-Royce to power Saudi Arabia’s new high-speed trains
Saudi Arabia September 14, 2025
Pakistan, DP World sign $400 agreement for first phase of Karachi freight corridor
Pakistan, DP World sign $400 agreement for first phase of Karachi freight corridor
UAE September 13, 2025
Saudi Arabia Boosts Rail Connectivity with Twenty New High-Speed Trains for Haramain Railway, Strengthening Hajj and Umrah Services
Saudi Arabia Boosts Rail Connectivity with Twenty New High-Speed Trains for Haramain Railway, Strengthening Hajj and Umrah Services
Saudi Arabia September 13, 2025
The UAE Positions Itself On Africa's Railway Map
The UAE Positions Itself On Africa’s Railway Map
UAE September 12, 2025
Rolls-Royce wins mtu engines contract for Saudi Arabia’s high-speed trains
Rolls-Royce wins mtu engines contract for Saudi Arabia’s high-speed trains
Saudi Arabia September 12, 2025

You Might also Like

Sheikh Mohammed's Etihad rail journey signals bold leap in UAE transport vision
UAE

Sheikh Mohammed’s Etihad rail journey signals bold leap in UAE transport vision

August 4, 2025
Civil works tendered for Abu Dhabi-Dubai high-speed rail
UAE

Civil works tendered for Abu Dhabi-Dubai high-speed rail

January 28, 2025
window
Qatar

Qatar Rail to launch 2nd edition of ‘Back to School’ event at Sport City Metro Station tomorrow

August 18, 2025
RITES Limited signs MoU with Etihad Rail.
UAE

RITES Ltd inks MoU with Etihad Rail to enhance UAE Rail infrastructure

October 10, 2024
gccrailway gccrailway
gccrailway gccrailway
Our platform is dedicated to delivering insightful coverage and analysis of the railway sector in Saudi Arabia, the UAE, Qatar, Kuwait, Oman, and Bahrain..

Editor Choice

Committee delay stalls Kuwait railway project
UAE: Prime Minister Travels on Etihad Rail Between Dubai and Fujairah
UAE residents eager for Etihad Rail launch: ‘Will be like metro connecting country’

Follow Us on Socials

We use social media to react to breaking news, update supporters and share information

Facebook Twitter Telegram
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Service
Reading: Bahrain to Build First Railways by 2030
Share
© 2024 All Rights reserved | Powered by GCC Railway
Welcome Back!

Sign in to your account

Lost your password?