By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
GCC RailwayGCC Railway
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
Reading: IMEEC Needs New East-West Rail Links; Ex- Railway Board Member Flags Key Gaps
Share
Notification
GCC RailwayGCC Railway
Search
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
© 2024 All Rights reserved | Powered by GCC Railway
GCC Railway > Saudi Arabia > IMEEC Needs New East-West Rail Links; Ex- Railway Board Member Flags Key Gaps
Saudi Arabia

IMEEC Needs New East-West Rail Links; Ex- Railway Board Member Flags Key Gaps

June 5, 2025 3 Min Read
Share
Times Now
SHARE

IMEEC dialogue throughout G20 meet.

Photograph : PTI

If the India-Center East-Europe-Financial Hall or IMEEC has to work properly, Jordan and likewise, Saudi Arabia and Israel should enhance their railway techniques. In fact, the present tensions in West Asia are a priority and the safety state of affairs has to enhance. IMEEC was introduced in the course of the G-20 assembly in India. A paper by M. Jamshed, former Railway Board member, says: “There isn’t any East-West railway community that’s out there for upgradation to the requirements required and to attach with Al Hadeetha (Saudi Arabia) within the east and Wager Shean (Israel) within the west. The current Jordanian railway community of about 506 km… is solely of no use to IMEEC now or in future. A brand new rail line of 250 km of the usual gauge and monitor requirements just like the Saudi Arabian Railways should be constructed between Al Hadeetha and Wager Shean through Amman for the IMEEC.” Jamashed provides {that a} feasibility research and a ultimate location survey must be accomplished in a short time.

Saudi Arabia additionally must get some work completed, says Jamshed. There’s a hyperlink in most areas however what’s most required is a line from Al Guwaifat within the UAE to Haradh in Saudi Arabia. As soon as that is completed by Saudi Arabia Railways, items might be unloaded in a UAE port and transfer all the best way to Haradh on the Saudi border. Different hyperlinks between Oman, as an example, and Saudi Arabia, can present further advantages.

Israel’s main process, says Jamshed, who was talking at a Chintan Analysis Basis perform, will likely be upgrading the Jezreel railway line linking Wager Shean with Haifa, the Adani-run port. At the moment, it’s only a 70-km lengthy single-track customary gauge railway line. Common passenger trains aside, only some freight trains run. However this line must be qualitatively improved, says Jamshed.

See also  Etihad Rail announces 30-minute Dubai to Abu Dhabi train line

The success and earlier than that, the early development of the railway traces will likely be essential. It’s an important factor that is still to be completed. As soon as it’s full, IMEEC can start, however the whole price is prone to be $10 billion, he says. What can also be essential to push issues alongside is an empowered group of specialists from the railways, ports and delivery sectors. And most significantly, there’s a want for political stability. A very powerful issue to make sure success is peace.

You Might Also Like

Etihad Rail brings the romance of train travel to the UAE

RITES and Etihad Rail sign MoU for rail infra projects in UAE, ET Infra

Alstom extends partnership with Saudi Railway Company to power up east-west freight corridor

11 companies prequalify to bid for $2bn Bahrain metro

Lands Set to be Acquired in the Northern Governorate for the Bahrain Metro Project | THE DAILY TRIBUNE

TAGGED:Railways NewsSaudi Arabia
Share This Article
Facebook Twitter Copy Link
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Latest News

Tunnel along the new Doha Metro Red Line
Doha Metro Red Line Starts Preview Services
Qatar June 18, 2025
Everything You Need To Know About The UAE-Oman 238km, Multi-Billion-Dollar Railway Project
Everything You Need To Know About The UAE-Oman 238km, Multi-Billion-Dollar Railway Project
UAE June 17, 2025
BAHRAIN CONFIRMS THE FIRST PHASE OF THE AMBITIOUS METRO RAIL PROJECT
Bahrain To Complete 109-km Light Metro Rail Bids On Mar 20
Bahrain June 15, 2025
How to Train Your Dragon actor, Gerard Butler on how Saudi Arabia is opening up to the world | World News
How to Train Your Dragon actor, Gerard Butler on how Saudi Arabia is opening up to the world | World News
Saudi Arabia June 14, 2025
Qatar Rail wins CIHT 2025 Decarbonisation Award for ‘Regenerative Propulsion in the Doha Metro’
Qatar Rail wins CIHT 2025 Decarbonisation Award for ‘Regenerative Propulsion in the Doha Metro’
Qatar June 14, 2025
News18
Saudi Arabia’s First Luxury Train ‘Dream of the Desert’ To Launch In 2026, Here’s What To Expect
Saudi Arabia June 13, 2025

You Might also Like

Etihad Rail
UAE

Etihad Rail Introduces New Brand Identity for the UAE

October 8, 2024
Kuwait Kicks Off First Phase of Landmark Railway Project
Kuwait

Kuwait Kicks Off First Phase of Landmark Railway Project

April 6, 2025
Qatar Rail holds annual Iftar for employees
Qatar

Qatar Rail holds annual Iftar for employees

March 16, 2025
UAE-Oman rail network construction set to begin
Oman

UAE-Oman rail network construction set to begin

August 30, 2024
gccrailway gccrailway
gccrailway gccrailway
Our platform is dedicated to delivering insightful coverage and analysis of the railway sector in Saudi Arabia, the UAE, Qatar, Kuwait, Oman, and Bahrain..

Editor Choice

Saudi Arabia tops Arab region in quality infrastructure rankings
Etihad Rail And India’s RITES Forge Strategic Partnership For UAE Rail Network Expansion
Kuwaiti Cabinet Briefed on Railway Connection Project with Saudi Arabia, Stresses its Importance

Follow Us on Socials

We use social media to react to breaking news, update supporters and share information

Facebook Twitter Telegram
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Service
Reading: IMEEC Needs New East-West Rail Links; Ex- Railway Board Member Flags Key Gaps
Share
© 2024 All Rights reserved | Powered by GCC Railway
Welcome Back!

Sign in to your account

Lost your password?