By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
GCC RailwayGCC Railway
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
Reading: Doha Metro’s B14 receives GSAS Platinum Certificate
Share
Notification
GCC RailwayGCC Railway
Search
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
© 2024 All Rights reserved | Powered by GCC Railway
GCC Railway > Qatar > Doha Metro’s B14 receives GSAS Platinum Certificate
Qatar

Doha Metro’s B14 receives GSAS Platinum Certificate

May 5, 2025 3 Min Read
Share
Doha Metro's B14 receives GSAS Platinum Certificate
SHARE

God’s Dr Yousef Al-Horr presents the plaque and certificates to the qatar rail’s engineer Abdulla Saif Al-Sulati.

Qatar Railways Firm (Qatar Rail) has introduced that the Doha Metro’s Administration and ICC Constructing (B14) at Al Wakra has achieved a Platinum ranking for GSAS Operations, Premium Scheme, including to its record of awards and recognitions within the subject of environmental excellence.

This recognition from the Gulf Organisation for Analysis & Improvement (Gord), the developer of the International Sustainability Evaluation System (GSAS), follows a radical analysis and audit of the mission, reflecting its excellent efficiency by way of sustainability and operational effectivity.

The award ceremony, held at B14, noticed Dr Yousef al-Horr, founding chairman of Gord, current the plaque and certificates to engineer Abdulla Saif al-Sulaiti, chief of Service Supply at Qatar Rail.

The Administration and ICC Constructing serves because the operational hub of the depot and homes the Built-in Management Centre (ICC), chargeable for making certain the seamless operation of Doha Metro companies.

Al-Sulaiti mentioned: “Dedication to sustainability is on the core of our mission to offer built-in railway companies which can be sustainable, dependable, engaging, and protected. By incorporating the rigorous requirements of GSAS, we’re making certain that our infrastructure not solely meets the very best ranges of effectivity and sustainability but additionally contributes to a greener, extra resilient future.”

Talking on the sidelines of the occasion, al-Horr mentioned: “By reaching GSAS inexperienced constructing certification not just for its state-of-the-art metro stations but additionally for vital help amenities just like the Administration & ICC Constructing, Qatar Rail has set a exceptional precedent for environmentally aware infrastructure improvement. This proactive strategy showcases a long-term imaginative and prescient that promotes a sustainable city future according to Qatar’s nationwide sustainability targets.”

See also  Indonesia partners with UAE to train 10 million coders

The B14 has been capable of obtain the very best GSAS Operations ranking due to a number of key inexperienced options. The constructing is optimised for power effectivity, with a central chilled water plant used to produce cooling all through the construction.

Power-saving tools and lighting scale back total power consumption. The water administration technique contains the recycling of wastewater for irrigation functions and helps preserve potable water assets.

Waste administration on the website additionally adheres to excessive environmental requirements, with nearly all of the waste recycled, decreasing the environmental influence of the operation. The mission has integrated a photo voltaic scorching water system too.

The most recent GSAS Operations certification of the Administration and ICC Constructing enhances the constructing’s current inexperienced constructing credentials, having beforehand earned a 4-star ranking underneath the GSAS Design and Construct Scheme as a part of the general Doha Metro Depot in Al-Wakra, and sophistication A* underneath the GSAS Building Administration Scheme.

Associated Story

You Might Also Like

Bahrain to get new $10bn railway link

Saudi Arabia Unveils ‘Dream of the Desert’ — The Kingdom’s First Ultra-Luxury Train at FII Riyadh | Economy

Morocco awards $2.9 billion contracts for 168 new trains

Saudi Arabia’s luxury train Dream of the Desert will be ‘moving masterpiece’ with 33 private suites

Civil Defence and Etihad Rail Test National Readiness

TAGGED:QatarRailways News
Share This Article
Facebook Twitter Copy Link
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Latest News

Allsopp & Allsopp - Logo
Why Etihad Rail Is Transforming Property Demand Across the UAE
UAE January 14, 2026
Etihad Rail prepares to launch the UAE's first passenger rail network
Etihad Rail prepares to launch the UAE’s first passenger rail network
UAE January 14, 2026
Etihad Rail’s latest passenger train station map: Your guide to UAE’s rail journey
Etihad Rail’s latest passenger train station map: Your guide to UAE’s rail journey
UAE January 13, 2026
Transforming UAE Travel with New Nationwide Train Network
Transforming UAE Travel with New Nationwide Train Network
UAE January 12, 2026
ArcelorMittal supplies rails for Oman-UAE cross-border railway project
ArcelorMittal supplies rails for Oman-UAE cross-border railway project
Oman January 12, 2026
Etihad rail
Etihad Rail Unveils Full UAE Passenger Railway Network, Enhancing Connectivity and Sustainable Travel Across 11 Cities
UAE January 12, 2026

You Might also Like

Etihad Rail and Citymapper Integrate for Seamless Travel Across the UAE
UAE

Etihad Rail and Citymapper Integrate for Seamless Travel Across the UAE

October 10, 2025
Rolls-Royce to supply 50 MTU Series 4000 diesel engines for Stadler's 200 km/h Saudi Arabia Railways trainsets
Saudi Arabia

Rolls-Royce to supply 50 MTU Series 4000 diesel engines for Stadler’s 200 km/h Saudi Arabia Railways trainsets

August 21, 2025
How Will Oman’s New LNG Train Impact Global Travel and Energy Markets?
Oman

How Will Oman’s New LNG Train Impact Global Travel and Energy Markets?

November 8, 2024
Preparatory work begins for railway link between Oman and UAE
Oman

Preparatory work begins for railway link between Oman and UAE

August 30, 2024
gccrailway gccrailway
gccrailway gccrailway
Our platform is dedicated to delivering insightful coverage and analysis of the railway sector in Saudi Arabia, the UAE, Qatar, Kuwait, Oman, and Bahrain..

Editor Choice

At least 11 killed in rail accident in west India, local media says
Construction just begun on ‘the next step’ of the Melbourne Airport Rail Link
Muscat Metro, cross-border rail projects key to Oman’s long-term mobility goals

Follow Us on Socials

We use social media to react to breaking news, update supporters and share information

Facebook Twitter Telegram
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Service
Reading: Doha Metro’s B14 receives GSAS Platinum Certificate
Share
© 2024 All Rights reserved | Powered by GCC Railway
Welcome Back!

Sign in to your account

Lost your password?