By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
GCC RailwayGCC Railway
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
Reading: Mumbai to Dubai in 2 Hours? All About the Underwater High-Speed Rail Corridor – VIDEO
Share
Notification
GCC RailwayGCC Railway
Search
  • Home
  • Saudi Arabia
  • UAE
  • Qatar
  • Kuwait
  • Bahrain
  • Oman
  • GCC Railway
    • GCC Railway Project News
    • Gulf Cooperation Council
    • Wikipedia
    • ResearchGate
    • MEED
    • UNIFE
© 2024 All Rights reserved | Powered by GCC Railway
GCC Railway > UAE > Mumbai to Dubai in 2 Hours? All About the Underwater High-Speed Rail Corridor – VIDEO
UAE

Mumbai to Dubai in 2 Hours? All About the Underwater High-Speed Rail Corridor – VIDEO

April 2, 2025 3 Min Read
Share
author-479264766
SHARE

Mumbai to Dubai Underwater Rail Hyperlink (Picture Supply: YouTube)

In a revolutionising transfer, Dubai and Mumbai shall be related via a 2000-kilometre underwater rail hyperlink. The plan proposed by the UAE’s Nationwide Advisor Bureau Restricted proposed that there shall be a high-speed prepare, which is able to run at speeds between 600 km per hour to 1,000 km per hour. Not solely will it change the best way folks journey, but in addition reduce down the journey time to only two hours between Mumbai and Fujairah in Dubai.

The plan was proposed some years in the past, however there have been no vital updates. A YouTube account, claiming to symbolize the Nationwide Advisor Bureau Restricted, additionally shared a video displaying how the rail hyperlink will look as soon as constructed.

There shall be gorgeous views of the underwater world through the journey. Contemplating the challenges and depth of the undertaking, funding of billions of {dollars} is predicted. As soon as finished, it’ll enhance commerce relations between India and the UAE.

Plan Prompt by UAE Official. If Accepted…As per the report, the undertaking is usually recommended by the UAE’s Nationwide Advisor Bureau Restricted. If it will get the approval then the rail hyperlink might be prepared by 2030. It might reduce journey time between the 2 international locations to only two hours, providing a faster and greener different to air journey.

Moreover passenger transport, the rail hyperlink would additionally assist transfer items like crude oil extra effectively from Dubai to India.

As soon as accomplished, the undertaking is predicted to strengthen financial ties and enhance connectivity between the nations, setting a brand new normal for worldwide journey and commerce.

See also  OHLA Doha project compensation « Euro Weekly News

Key Highlights of the Undertaking:The prepare is predicted to achieve speeds of 600 to 1,000 km/h.

The journey between Mumbai and Dubai will take solely 2 hours.

This bold underwater rail system would require an funding of billions of {dollars}.

Along with passenger journey, it’ll allow quicker transport of crude oil and different items from Dubai to India.

Discussions are ongoing, with plans to finish the undertaking by 2030 if authorized.

The prepare shall be a powerful competitor to air journey, providing a fast and environment friendly hyperlink between the 2 international locations.Get Newest Information Stay on Occasions Now together with Breaking Information and High Headlines from Mumbai and around the globe.

You Might Also Like

Stadler to Supply 10 Intercity Trains to Saudi Arabia

Jordan and UAE to co-operate on Aqaba railway project | News

Renfe Opens a New Branch in the UAE

Program to Localize Saudi Railway Industry at Saudi Railways Event

Tenders issued for high speed Abu Dhabi-Dubai rail link

TAGGED:Railways NewsUAE
Share This Article
Facebook Twitter Copy Link

Latest News

Etihad Rail Introduces Certificates for Carbon Emission Reduction
Etihad Rail Introduces Certificates for Carbon Emission Reduction
UAE June 19, 2025
Tunnel along the new Doha Metro Red Line
Doha Metro Red Line Starts Preview Services
Qatar June 18, 2025
Everything You Need To Know About The UAE-Oman 238km, Multi-Billion-Dollar Railway Project
Everything You Need To Know About The UAE-Oman 238km, Multi-Billion-Dollar Railway Project
UAE June 17, 2025
BAHRAIN CONFIRMS THE FIRST PHASE OF THE AMBITIOUS METRO RAIL PROJECT
Bahrain To Complete 109-km Light Metro Rail Bids On Mar 20
Bahrain June 15, 2025
How to Train Your Dragon actor, Gerard Butler on how Saudi Arabia is opening up to the world | World News
How to Train Your Dragon actor, Gerard Butler on how Saudi Arabia is opening up to the world | World News
Saudi Arabia June 14, 2025
Qatar Rail wins CIHT 2025 Decarbonisation Award for ‘Regenerative Propulsion in the Doha Metro’
Qatar Rail wins CIHT 2025 Decarbonisation Award for ‘Regenerative Propulsion in the Doha Metro’
Qatar June 14, 2025

You Might also Like

Turkey, Iraq, Qatar and UAE to develop Gulf to Europe rail corridor | News
Qatar

Turkey, Iraq, Qatar and UAE to develop Gulf to Europe rail corridor | News

August 30, 2024
Lusail Tram network expands with inauguration of Turquoise Line
Qatar

Lusail Tram network expands with inauguration of Turquoise Line

January 10, 2025
UAE, Jordan sign MoU to build $2.3bn freight railway from Dead Sea to Red Sea – Middle East Monitor
UAE

UAE, Jordan sign MoU to build $2.3bn freight railway from Dead Sea to Red Sea – Middle East Monitor

September 9, 2024
UAE to Invest $2.3 Billion in the Construction of a Railway in Jordan
UAE

UAE to Invest $2.3 Billion in the Construction of a Railway in Jordan

September 6, 2024
gccrailway gccrailway
gccrailway gccrailway
Our platform is dedicated to delivering insightful coverage and analysis of the railway sector in Saudi Arabia, the UAE, Qatar, Kuwait, Oman, and Bahrain..

Editor Choice

UAE, Jordan sign $2.3 billion investment agreement to boost railway sector
City Center Doha inaugurates new pedestrian bridge connecting to DECC metro station
New Passenger Rail Service by Etihad Rail Set to Transform UAE Travel, with Hitachi Rail Leading System Integration

Follow Us on Socials

We use social media to react to breaking news, update supporters and share information

Facebook Twitter Telegram
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Service
Reading: Mumbai to Dubai in 2 Hours? All About the Underwater High-Speed Rail Corridor – VIDEO
Share
© 2024 All Rights reserved | Powered by GCC Railway
Welcome Back!

Sign in to your account

Lost your password?